Sunday, September 30, 2018

Offshore menu and provisioning list

This menu worked very well.  We deviated some
Dinners Fettuccini Alfredo w/ canned chicken, peas, Fettuccine 1lb, Alfredo sauce 16oz 3 cans chicken, 1 can peas Goya rice and beans packet with polish sausage
Polish was sausage 16oz, Goya rice and beans 8oz, 3 Spaghetti w/ meat sauce, green beans
Spaghetti 1lb, ground beef or Italian sausage 1lb, Sauce 26oz Garlic Can green beans 

Hamburgers, potatoes, corn —1st night
Ground beef 1lb, buns, 6 potatoes, Spinach salad Chix peas with Indian sauce over rice
Chick pea 16oz can, Indian Masala sauce, rice 

Beef stew in pressure cooker, spices, 2lbs stew meat, oil, onion, carrots 4, potatoes 8 beef broth, tomato paste, wine Spice: basil, thyme, salt, Pepper/ flour 2TBS 
Black Bean tacos twice — night two: 2 cans black beans Cheese 4 oz Tortillas cabbage, avocado, tomatoes, Hot sauce Rice spices
Black eyed peas with bacon and sausage in pressure cooker
Dried black-eyed peas, 16oz Back bacon 1/2 lb Kielbasa Sausage Onion Garlic 3 Chick broth 6 cups Tomato paste 1/4 cup, Spices, Honey 1 TBS Green pepper
Canned food extras Beans 3 Refried beans 3 Chili 3 Pasta and sauce 3 Soups 6 Stew 3
Cooking supplies Oil 12 oz Vinegar 12 oz Butter 2 stick Honey 8 oz
Lunches Ham chunk 2.5 lbs Salami hard chunk 2 lbs Tuna 6 cans Hummus 2 Cheddar 1 lb Swiss 1 lb Cucumber 2 Bread 4 loaves Mayonnaise, relish, mustard, ketchup
Sides Three bean salad 3 Cole slaw
Cabbage,
Fruit Canned peach halves Canned pineapple Apples Oranges Honey dew melon
Snacks Granola bars Nuts Dried fruit
Raisins Carrots
Drinks Wine 6 Powdered milk Powdered sugar drink Coke 2 cases
Breakfast Yogurt 4 Granola 4 lbs Eggs 4 dozen Pancake mix 32 oz
Sweets Chocolate Cookies
Personal
(bring your own) Water bottle Travel mug Head lamp Towel

Sunday, September 9, 2018

Screwing into fiberglass w/o cracking it

For your run-of-the-mill fiberglass boat with gelcoat, these drill sizes should suffice to make a nice pilot hole.

#4 use 3/32"
#6 use 1/8"
#8 use 9/64"
#10 use 11/64" (or 5/32" in a pinch)
#12 use 3/16"

To drill and put the screw in without cracking the gelcoat, here's what I do. YMMV.

1) Use a 1/16" drill and drill in REVERSE until you get through the gelcoat in into raw fiberglass or wood, then you can put the motor in forward and finish up.

2) Use a countersink bit to chamfer the hole to be a little larger diameter than the screw you are going to insert.

3) Use the appropriate size drill for your pilot hole and again, drill it in REVERSE until you get through the gelcoat.

4) If possible, use a hand screwdriver to insert the screw and GO SLOW and DO NOT OVER TIGHTEN.

Some optional ideas and methods....

-- You can use masking tape over the area you are drilling and it will further help prevent gelcoat cracking.

-- You can make a groove in the screw, on each side, from the point up to the screw's widest area which makes it look like a regular self-tapping screw. I have not used this method but I hear it works well to prevent cracking. I think it gives the debris a place to go and doesn't bind up as much.

-- You should probably use 3M 4200 (or silicone at the very least) on all screws if you want to ensure no water gets behind them.

(lifted from CarolinaSkiffOwner.com)

Saturday, September 8, 2018

Project List

2016
Switch shaft seal to stuffing box 350
Replace Cutlass bearing 1805
Repack rudderstock stuffing box 300
Clean engine mounts 180
Steering service 250
Seacock service 475
Exterior varnish 3290
Add salt water foot pump at galley sink
Head rebuilt
Trinka conversion to sailing dinghy 2000
Traveler redesign- self
New Sea Frost electric fridge w/ freezer box 5290
New Firefly batteries (2 Group 31) 1382
Victron 702 battery monitor 236
Replaced all lights with LED - self
added Solar panels
replaced VHF radio 260
added AIS transceiver 2120
Safety equipment added
  Zoidak liferaft
  jacklines
  flares (SOLAS), smoke signals, rocket flares)
  throw line
  SOS Dan Bouy
  EPIRB battery replaced
Irridum 9555 sat phone 1705
Storm jib (used) 145
Added running backs 1600
Added boom padeyes for preventers 725
Added Lexan drop boards for offshore 425
oil change
Added secondary winches (Lewmar Ocean Series 30CST) 1350 - self
Repaired keel damage from running aground 1300
Replaced Autopilot controller 50
Repair boom gooseneck 580
2017
Replaced cabin top winches and added bases to raise them and prevent wraps 1500 - self
Sailrite LSZ-1 sewing machine 
Canvas:
  built boom-hung sun awning - self
  built sun cover for dry storage - self
  built covers for teak cap rail - self
Replaced shower sump pump
Fuel polishing and fuel tank cleaning
Removed engine:
  replaced engine mounts
  replaced wiring harness which was undersized
  replaced starter
  removed rust and painted engine
  replaced impeller
oil change
2018
Irma repairs done in Caribbean:
  Replaced standing rigging after Irma 9174
    LC 32 ProFurl furler
    added Wichard wheel backstay tensioner
  Replaced lifelines 1234
  Bow pulpit repaired 1685
  Replaced VHF antenna, masthead tricolor LED, windex, Raymarine wind tranducer 2233
  Replaced wires (wind, VHF and power) in the mast
  New lines - boom vang, main sheet, flag halyard
  Installed radar pole 1800
  Replaced Xintex s-2 Propane monitor (due to water damage) 486 - self
  Replace Victron (due to water damage) - self
Bottom heavily sanded and painted
Repacked propeller shaft stuffing box - self (partly)
Winches cleaned (7) - self
reduced friction in reefing system with low-friction rings - self
added Jordan Series Drogue 1400
Irma repairs done in Maine:
  Replaced starboard rubrail 6300
  Replaced starboard caprail 10600
  Rebedded starboard stanchions
  Rebedded starboard genoa fairlead track
  Replaced starboard chainplates and repaired bulkhead below them that was crushed in Irma
  Replaced taftrail 4300
  Repaired hull-deck joint on stern
  Reinforced aft chucks (so they can anchor running backs)
  Steaming/deck light
Rebuilt all portlights (12)
Replaced both overhead hatches
Awlgrip touch up
Repaired blown out Genaker 1000
Installed Monitor wind vane steering 7500
Rig inspection 1000
Added 6:1 purchase on the main outhaul 400
Added reef line fairleads at the boom gooseneck
Installed a rope clutch for the jib furling line
added VHF speaker at helm 300
Filled the fastener holes in the cabin end
Patched the nonskid
Trimmed the cabin sole lift outs
added Forespar carbon fiber spinnaker pole  2900and mast track
2019
Irridium Go! with external antenna and Predict Wind subscription
sails 22k
  Quantum 6000 main 6800 and jib 6300
  Solent w/reef 3500
  Hood MPG drifter
Convert to 2-line, 3-reef system 7300
Dyneema stay added for Solent 4600
halyards and headsail sheets -- built by me
soft shackles for Solent -- built by me
Clean bilge and under floorboards after flooded
Strip varnish 1650
Repair stbd rubrail joint
Rebuild wheel brake 750
Manual bilge pump inside cabin 1700
Recalibrate Raymarine wind instrument
Replace autopilot control head with one found on eBay
Install light on wind vane
Service windlass 1500
Install USB outlets 450
Energy system install -- 140A alternator, regulator, new pully to accommodate wide, flat belt 3000
Clean up poor electrical wiring 3300
Battery charge/discharge test - to evaluate existing batteries
Service seacocks which were underwater when the cabin flooded in hurricane 200
Repair floor timbers 2150
Achilles inflatable floor dinghy 4000
Yamaha 10HP outboard 3000
Rocna 20kg anchor
Shaw and Tenney oars for tender
new Espar heater 4400
new water heater 1800
exhaust 1250
engine inlet hose1000
in Noank:
Gerry and Sandy reset spreader height
New electronics 12,000
    Raymarine chart plotter, type 2 Autopilot, Quantus digital radar, 4 repeaters to helm and nav station
Replace Xantek propane sniffer again
build storage for Sailrite sewing machine in locker
installed rope hanger, copied Bluebird
fixed v-berth shelf, first of several times
splice anchor snubber
adjust stuffing box (becomes regular chore
oil in outboard motor's carburetor because stored wrong side up
Trinka centerboard insert to keep water from coming in centerboard while towing, w/Sandy VanZandt
rebuilt windlass with parts from a bike store at picnic table in Marthas Vineyard
John Williams:
seal antifreeze leak forward side engine hose
oil change
New hoses to and from head, holding tank, thru hull after I tried to unclog for a full day 1460
new Force 10 stove 2250
rebuild gooseneck and reefing blocks after failure 1500
lag bolts in stern mooring chock after block ripped out, Leif unable to get nut on end 440
in Maine:
added rope clutches for 3rd reef, Leif pointed out they were backwards, repeated
replaced water pressure pump
replaced shower sump pump but it failed again shortly thereafter
hung internal clothes line and food hammocks
laced leathers onto oars
Life raft recertified
sewing:
canvas case for electronic keyboard
laundry hamper
bags under aft quarter berth shelf
bag for v-berth forward panel
remove runners from bottom of hard dinghy and fill holes
unclog engine seacocks many times
remove lobster pot from prop in 52F water
Built shelf for third battery 
3 new Firefly batteries for expanded house bank
Steiner binoculars replaced (warranty)
in Chesapeake:
new refrigerator thermostat due to corrosion of old one
replace Dyneema Solent stay with Coligo
increased purchase in Solent stay tensioner
replaced steering cables after finding serious fray
loud siren for Raymarine radar and AIS alarms
in Caribbean:
reattach Autopilot base which ripped off because Monitor wind vane was engaged at same time
replaced spinnaker with used one from Bacon Sails
thru bolted chart plotter bracket to swing arm after wood screws ripped out underway
remove water and repair force 10 stove due to salt water
Developed new fairlead for Solent halyard -- 4 month process, completed in Pointe a Pitre
reroute solar wires to bimini
Marionics repairman found corrosion of cord going to AP control head
Tracked down freshwater leak and found two
Replaced engine pulley because a bolt fell out then other holes elongated creating wobble
replaced propeller zinc underwater
repair Genoa sheet after wrapped around propeller, invented way to lengthen non-tensioned tail
replace bilge pump float switch
Rebuilt head foot pump
Teak oil exterior wood several times
T9 protection of hinges and latches
several patches to Bimini
reset porthole clearances with Leif and reduced windows which leaked
replaced bilge alarm siren with one from auto parts store on Guadeloupe
LFR for spin downhaul
reattach wood trim piece that had gradually accrued
oil change (1st one by self with IYM pump)
rig inspection by Wickhams Cay II riggers found set screw missing from fuller
new Wichard back stay tensioner (warranty)
lube masthead shivs
replaced lifeline gate
IYM replaced shifter cable in Nanny Cay
new Raymarine EV-1 compass (warranty)
weld nav station chair base back together
new washer that fits into slot on helm axis
built curtain so Ruby could have her own place
spliced traveler
respliced Genoa halyard after chafe found
sewed leather spreader tip covers which Gerry had left taped after
cleaned winches
rebuilt fender board
sail repairs at Quantum after passage home (torn main luff, torn Genoa cover, luff flutter warranty)
after year of cruising:
Fishing Bay marina in Deltaville repairs (never again)
    oil change
    lube thru-hulls and replace galley sink thru-hull
    replace frozen exit block base of mast
    repair fuller foils first time
Annapolis electronics
    separate auto-pilot wiring from chart plotter circuit
    sent Raymarine chart plotter in for warranty repair
M Yacht repairs
    forward bulkhead repair where it was buckling
    sand and paint bottom
    inspect and lubricate rudder bearings
    replaced impeller
    repack stuffing box
    new window gasket (incredibly effective solid tubing)
    buff topsides
    new bilge float switch
    replace balls in Harken Battcar system for main luff track
Quantum sail repair 1100
Mystic
    new Victron charger/inverter (Lucas)
    troubleshoot poor Vhf/AIS signal
        new splitter
        rerun antenna cable from splitter to mast
        new antenna
    WiFi antenna and router
reinforce V-berth shelf with wooden block (self)
replace pulpit-mounted fairlead block for furler line (self)
replace fridge gasket (self)
replaced o-ring gaskets for Dorade vents (self)
replaced exit blocks for Monitor with Protexit Blocks (self)
in Bermuda (self)
   reconnect compass light via solder
   replace Monitor lines after chafe  
Fort Rachel
    fixed fulrer foils properly by dropping headstay (Jeff Morgan)
    haul and wash before Maine rocks Race
replaced forward most pulpit-mounted block for fuller
Maine Yacht Center 2021
    starter cable cleaned
    oil change
Maine Yacht Center 2022
    Base of mast corrosion cleaned up 1000
    Mast step repaired 225
    Zincs 250
    Espar repair 1000
    New Propane Cylinders (too embarrassed to list cost)
    Bow light repair  450
    reconnect autopilot to Raymarine control to enable auto wind vane 650
    Wire conduit in mast replaced along with wires including better Vhf cable 1700
    new Vhf antenna
    New starter motor 900
    New fuel gauge
    Tachometer repair and clean rat's nest of wires behind control panel
    Move batteries forward to move weight out of stern 1500+
    New starter motor and relay, moved forward
    Keel bolts tested with torque wrench 360
    Outboard motor serviced
Built new set of hanks that are longer for Solent and a set for staysail with pull ties
Discussed changing rake with Chuck Paine and Brian Harris but did not change it
Sent GO! to OCENS who confirmed its death
Leather steering wheel cover, boat gift from crew
Huge down wind spinnaker, Quantum 6500
Correction of data loops in Raymarine by Lyman Morse 900
Hired install of impeller in Rockland 150 (I had part)
Installed Harken 150 cam cleats for cockpit winches (gift from crew)
Off season projects winter '22-'23
    new Windsor life raft
    replace spin head swivel block
    clips to hold traveler line at helm
    gaskets for all opening ports
    respliced wire staysail stay with Dyneema (using stretched Solent stay)
    repaired spinnaker tack line which had chafed by resplicing it (shortened)
    new larger diameter preventer lines
    sewed another patch on Bimini
    built fender covers with Sailrite kit given to me as a gift
    obtained over-the-top blocks from Schaefer in an attempt to reduce Monitor chafe
    replaced solent halyard
MYC winter '22-'23
    standing rigging 10k
        retained Merriman turnbuckles
        new Harken Mark IV furler
    new diverter for solent
    rebedded deck hardware to address leaks in vicinity of stbd dorade vent 1750
    replace spin halyard block, shackle (nearly worn through) and bale 450
    keel fairing 5k
    bottom paint 1350
    Beta 30 engine, Balmar 170A alternator 15k plus install
    new bow running light placement on either side rather than centerline 2k
    new salt water foot pump in galley 265
    new trash can runners 500

Transmission oil change 25h

Oil change at 50h

Keel gap evaluated by Adrian Johnson, AMS and Chuck Paine (designer)

Extra Keel bolt place forward on centerline

Cabin cushions professionally cleaned 1500

Moved starter fuse to above engine, port side

Replaced Ritchie Compass light

Boom repair, forward stb side

2024

New bag for Lifesling, homemade